单项选择题
A load line of a ship is assigned by().
A.Minerals Management Service
B.Department of Energy
C.Corps of Engineers
D.A recognized classification society approved
点击查看答案&解析
相关考题
-
单项选择题
A floating vessel will behave as if all of its weight is acting downward through the().
A.center of gravity
B.center of buoyancy
C.center of flotation
D.metacenter -
单项选择题
A continual worsening of the list or trim indicates().
A.negative GM
B.progressive flooding
C.structural failure
D.an immediate need to ballast -
单项选择题
()we have worked out the loading plan,we shall start doing more revision work.
A.For now
B.Ever since
C.Now that
D.By now
