单项选择题
The inability to supply a cargo of the contractual quantity in the country of shipment()the doctrine of frustration into operation.
A.is capable of bringing
B.is sufficient to bring
C.is not capable of bringing
D.is probally to bring
点击查看答案&解析
相关考题
-
单项选择题
The full utilization of berths can be achieved if().
A.ships arrive at random
B.cargo-handling time varies greatly
C.ships have to queue to get onto berths
D.ships do not have to wait to get onto berths -
单项选择题
The foreman says that the stevedores stopped working owing to the()of the winch.
A.breakdown
B.breaked down
C.broken down
D.broke down -
单项选择题
The force acting on a single cargo runner which is vertically lifting or lowering a load is greatest when().
A.decelerating when lowering the load
B.decelerating when raising the load
C.lowering the load at constant speed
D.raising the load at constant speed
