单项选择题
Prior to a ship’s departure from any port () should be tested with deck officer to ensure satisfactory operation.
A.fire fighting pump
B.the steering gear
C.life boat engine
D.the main engine
点击查看答案&解析
相关考题
-
单项选择题
The()is a series of trials done at sea to determine whether the ship has met the specifications of design, modification, or repair.
A.Sea trial
B.Bed-test
C.Engine performance
D.PSC inspection -
单项选择题
When is dock survey carried out?()
A.During annual repair
B.Usually during dock repair
C.Before sea trial
D.After 5 years from last annual survey -
单项选择题
(), where a ship is refitted for a different use.
A.Voyage repairs
B.Routine docking
C.Damage repairs
D.Conversion
