单项选择题
What type of stopper would you use on a nylon mooring line? ()
A.Chain
B.Nylon
C.Manila
D.Wire
点击查看答案&解析
相关考题
-
单项选择题
What is the purpose of the intermediate spring?()
A.Serves as a backup for the main tow hawser in case of failure
B.Provides weight and flexibility to the total tow makeup
C.Lengthens the main tow hawser to keep the tow in step
D.Distributes the towing load -
单项选择题
What could cause a significant difference between actual chain tension and the tension measured by the tensiometer? ()
A.The type of anchor and mooring line being used
B.The type of bottom in which the ship is anchored
C.A significant difference between air and water temperature
D.The chain contacting a chock or fairlead between the tensiometer and the lower swivel fairlead -
单项选择题
We took usual steps:sounding the depth,reversing and stopping engine,paying out anchor and 60 fathoms of chain cable in the depth of 12 fathoms.The operation above is().
A.berthing
B.searching
C.anchoring
D.picking up pilot
