单项选择题
Fueling activities()waste liquids and vapor releases to air.
A.commence
B.generate
C.give
D.have
点击查看答案&解析
相关考题
-
单项选择题
Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
A.liable for any repair
B.liable for any failure
C.responsible for any repair
D.responsible for any fulfilling -
单项选择题
When hoisting a boat on gravity type davits using an electric motor driven winch,the davit arms should be brought up().
A.to their final position with the winch operating at slow speed
B.to the bar stop,and then hand cranked to their final position
C.until just before they make contact with the limit switch,and then hand cranked to their final position
D.to the embarkation deck,and then hand cranked to their final position -
单项选择题
When a line is spirally coiled about its end and lying flat on deck,it is said to be().
A.coiled
B.faked
C.flemished
D.seized
