单项选择题
The fixing of a canceling date on a charter-party merely()warning to the Shipowner that non-arrival by this date may result so as to entitle the Charterer to rescind.
A.takes
B.comes
C.goes
D.gives
点击查看答案
相关考题
-
单项选择题
The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().
A.terminal operator
B.owner of the barge
C.tankerman or person in charge of loading
D.charterer through the Master of the towing vessel -
单项选择题
The fact that it has become impossible to procure a cargo(),as a rule,relieve the Charterer of liability.
A.is not
B.is
C.does not
D.can hardly be -
单项选择题
The claim for dead freight being a claim for damages for breach of contract,the Shipowner is under a duty,where the Charterer fails to load a full and complete cargo,()the damage by obtaining other cargo,provided he acts reasonably in so doing.
A.to minimize
B.minimizing
C.minimized
D.have minimized
