单项选择题
What term indicates the line drawn at the top of the flat plate keel().
A.Base line
B.Molded line
C.Designer's waterline
D.Keel line
点击查看答案&解析
相关考题
-
单项选择题
What is TRUE about hoisting operations().
A.Personnel may work beneath suspended loads,as long as they are alert and wear hard hats
B.If a suspended load with no tag begins to spin,personnel should attempt to stop the spinning if the load is within reach
C.If tag lines are used to control a suspended load,they should be secured to the deck
D.Personnel not involved in the hoisting operation should be kept clear of the transfer area -
单项选择题
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
A.selected
B.collected
C.detected
D.effected -
单项选择题
The Repairer shall be relieved of all obligations under these terms and conditions caused by such all following matters except().
A.act of God
B.lock-out
C.strike
D.paint fire